PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


    1. Install the No. 1 vacuum switching valve assembly.

    2. Engage the wire harness clamp and connect the No. 1 vacuum switching valve assembly connector.

    3. Connect the No. 2 fuel vapor feed hose.

    4. Connect the fuel vapor feed hose assembly.