COMMON RAIL INSTALLATION

PROCEDURE


  1. INSTALL COMMON RAIL ASSEMBLY


    1. Install the common rail assembly with 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the No. 2 fuel hose.

    3. Connect the connector.

  2. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

    Click here

  3. INSTALL NO. 1 INJECTION PIPE SUB-ASSEMBLY

    Click here

  4. INSTALL NO. 2 INJECTION PIPE SUB-ASSEMBLY

    Click here

  5. INSTALL NO. 3 INJECTION PIPE SUB-ASSEMBLY

    Click here

  6. INSTALL NO. 1 EGR COOLER BRACKET

    Click here

  7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE

    Click here

  8. INSTALL EGR WITH COOLER PIPE ASSEMBLY

    Click here

  9. BLEED AIR FROM FUEL SYSTEM

    Click here

  10. INSPECT FOR FUEL LEAK

    Click here