DESCRIPTION
w/o Entry and Start System
While the engine is being cranked, current flows from terminal ST1 of the ignition switch assembly to the park/neutral position switch assembly and also flows to terminal STA of the ECM (STA Signal).
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Tech Tips
This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table Click here.
PROCEDURE
READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the tester on.
Enter the following menu items: Powertrain / Engine and ECT / Data List / Starter Signal.
Read the value.
| OK | ||||||
|---|---|---|---|---|---|---|
|
| OK |
|
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| NG |
|
CHECK ST RELAY (POWER SOURCE)
| *1 | Engine Room Main Relay Block |
| *2 | ST Relay Holder |
Remove the ST relay from the engine room main relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Tech Tips
The engine does not crank because the relay is not installed.
Reinstall the ST relay.
| NG |
|
CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) Click here |
| OK |
|
INSPECT ST RELAY
Inspect the ST relay Click here.
| NG |
|
REPLACE ST RELAY |
| OK |
|
CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
Remove the ST relay from the engine room main relay block.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the ST relay.
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - BODY GROUND) |
CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)
Remove the ST relay from the engine room main relay block.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reinstall the ST relay.
Reconnect the park/neutral position switch assembly connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
| OK |
|
INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
Inspect the park/neutral position switch assembly Click here.
| NG |
|
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - IGNITION SWITCH)
Disconnect the park/neutral position switch assembly connector.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the park/neutral position switch assembly connector.
Reconnect the ignition switch assembly connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - IGNITION SWITCH) |
| OK |
|
INSPECT IGNITION SWITCH ASSEMBLY
Inspect the ignition switch assembly Click here.
| OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH ASSEMBLY - BATTERY) |
| NG |
|
REPLACE IGNITION SWITCH ASSEMBLY Click here |