ECM INSTALLATION

PROCEDURE


  1. INSTALL NO. 2 ECM BRACKET


    1. Install the No. 2 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  2. INSTALL NO. 1 ECM BRACKET


    1. Install the No. 1 ECM bracket with the 2 screws.

      Torque:
      3.0 N*m  { 31 kgf*cm, 27 in.*lbf }
  3. INSTALL ECM


    1. Install the ECM with the bolt and nut.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 2 ECM connectors.

    3. Install the 2 lock knobs.

  4. INSTALL NO. 1 ENGINE COVER

    Click here

  5. INSTALL BATTERY CARRIER

    Click here

  6. INSTALL BATTERY TRAY

    Click here

  7. INSTALL BATTERY

    Click here

  8. INSTALL OUTER COWL TOP PANEL (for RHD)

    Click here

  9. INSTALL INNER COWL TOP TO COWL BRACE (for RHD)

    Click here

  10. INSTALL INNER LOWER COWL TOP REINFORCEMENT (for RHD)

    Click here

  11. INSTALL COWL TOP INSIDE CORNER PANEL RH (for RHD)

    Click here

  12. INSTALL FRONT NO. 1 VENTILATOR SEAL (for RHD)

    Click here

  13. INSTALL FRONT AIR SHUTTER SEAL RH (for RHD)

    Click here

  14. INSTALL WINDSHIELD WIPER MOTOR AND LINK (for RHD)

    Click here