ECM INSTALLATION

PROCEDURE


  1. INSTALL ECM


    1. Install the ECM with the bolt and 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Install the water pipe with the 2 nuts. (w/ Combustion Type Power Heater)

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Install the brake booster vacuum pipe with the 2 bolts. (w/ Combustion Type Power Heater)

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. A005H0W

      Connect the 2 ECM connectors.

    5. Lock the 2 lock knobs.