ECD SYSTEM Cranking Holding Function Circuit

DESCRIPTION


WIRING DIAGRAM

A005LKCE01

CAUTION / NOTICE / HINT

Note

Inspect the fuses for circuits related to this system before performing the following inspection procedure.

Tech Tips

This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to Problem Symptoms Table Click here.

PROCEDURE


  1. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)


    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to ON.

    3. Turn the tester on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

    5. Read the values.

      OK
      Ignition Switch Position Starter Signal
      ON OFF
      START ON

    OK
    NG
  2. CHECK ST RELAY (POWER SOURCE)


    1. A005HVRE07
      Text in Illustration
      *1 Engine Room Main Relay Block
      *2 ST Relay Holder

      Remove the ST relay from the engine room main relay block.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      ST relay terminal 2 - Body ground Engine cranking 11 to 14 V
    3. Reinstall the ST relay.

      Result
      Result Proceed to
      OK A
      NG (Manual transaxle) B
      NG (Multi-mode manual transaxle) C

    B
    C
    A
  3. INSPECT ST RELAY


    1. Inspect the ST relay Click here.


    NG
    OK
  4. CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)


    1. Remove the ST relay from the engine room main relay block.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      ST relay terminal 2 - Body ground Always Below 1 Ω
    3. Reconnect the ST relay.

      Result
      Result Proceed to
      OK (Manual transaxle) A
      OK (Multi-mode manual transaxle) B
      NG C

    A
    B
    C
  5. CHECK HARNESS AND CONNECTOR (ST RELAY - CLUTCH START SWITCH ASSEMBLY)


    1. Remove the ST relay from the engine room main relay block.

    2. Disconnect the clutch start switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      ST relay terminal 2 - A39-1 Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      ST relay terminal 2 or A39-1 Body ground Always 10 kΩ or higher
    4. Reinstall the ST relay.

    5. Reconnect the clutch start switch assembly connector.


    NG
    OK
  6. INSPECT CLUTCH START SWITCH ASSEMBLY


    1. Inspect the clutch start switch assembly Click here.


    NG
    OK
  7. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH ASSEMBLY - CERTIFICATION ECU)


    1. Disconnect the clutch start switch assembly connector.

    2. Disconnect the certification ECU (smart key ECU assembly) connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      A39-2 - F65-5 (STAR) Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      A39-2 or F65-5 (STAR) - Body ground Always 10 kΩ or higher
    4. Reconnect the clutch start switch assembly connector.

    5. Reconnect the certification ECU (smart key ECU assembly) connector.


    OK
    NG
  8. CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY)


    1. Remove the ST relay from the engine room main relay block.

    2. Disconnect the park/neutral position switch assembly connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      ST relay terminal 2 - E2-1 Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      ST relay terminal 2 or E2-1 - Body ground Always 10 kΩ or higher
    4. Reinstall the ST relay.

    5. Reconnect the park/neutral position switch assembly connector.


    NG
    OK
  9. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    1. Inspect the park/neutral position switch assembly Click here.


    NG
    OK
  10. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - CERTIFICATION ECU)


    1. Disconnect the park/neutral position switch assembly connector.

    2. Disconnect the certification ECU (smart key ECU assembly) connector.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance (Check for Open)
      Tester Connection Condition Specified Condition
      E2-2 - F65-5 (STAR) Always Below 1 Ω
      Standard Resistance (Check for Short)
      Tester Connection Condition Specified Condition
      E2-2 or F65-5 (STAR) - Body ground Always 10 kΩ or higher
    4. Reconnect the park/neutral position switch assembly connector.

    5. Reconnect the certification ECU (smart key ECU assembly) connector.


    OK
    NG