HEADLIGHT LEVELING ECU INSTALLATION

PROCEDURE


  1. INSTALL HEADLIGHT LEVELING ECU ASSEMBLY


    1. Install the headlight leveling ECU sub-assembly with the screw.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the connector.

  2. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here

  3. HEADLIGHT LEVELING ECU INITIALIZATION

    Click here

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  5. INSPECT SRS WARNING LIGHT

    Click here