ГЕНЕРАТОР СНЯТИЕ

Информация добавлена 08-08-2017

PROCEDURE


  1. PRECAUTION

    Note

    After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work Click here.

  2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  3. REMOVE UPPER RADIATOR SUPPORT SEAL

    Click here

  4. REMOVE BATTERY

    Click here

  5. REMOVE BATTERY TRAY

  6. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  7. REMOVE FAN AND GENERATOR V BELT

    Click here

  8. REMOVE NO. 2 IDLER PULLEY SUB-ASSEMBLY


    1. B001TQV

      for Integrated Type:

      Remove the bolt and No. 2 idler pulley.

    2. for Separate Type:

      Remove the bolt, No. 2 idler pulley cover plate, No. 2 idler pulley and idler pulley cover plate.

  9. REMOVE WIRING HARNESS CLAMP BRACKET


    1. B001RSC

      Detach the clamp.

    2. Remove the bolt and wiring harness clamp bracket.

  10. REMOVE NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

    Click here

  11. REMOVE GENERATOR ASSEMBLY


    1. B001PUB

      Open the terminal cap.

    2. Remove the nut and disconnect the wire harness from terminal B.

    3. Disconnect the generator connector from the generator assembly.

    4. B001S3J

      Remove the 2 bolts and disconnect the wire harness.

    5. B001QUQ

      Detach the wire harness clamp.

    6. Remove the bolt from the cylinder block.

    7. B001U6D

      Remove the 2 bolts and generator assembly.

    8. B001URI

      Remove the bolt and generator bracket.