ДАТЧИК ДЕТОНАЦИИ УСТАНОВКА

Информация добавлена 08-08-2017

PROCEDURE


  1. INSTALL KNOCK SENSOR


    1. B001U4SC01
      *A for Bank 2
      *B for Bank 1
      *a Engine Rear
      *b Top
      *c Engine Front
      *d 0 to 15°

      Install the 2 sensors with the 2 bolts as shown in the illustration.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 sensor connectors.

  2. INSTALL NO. 1 WATER OUTLET PIPE


    1. Install the water outlet pipe with the 2 nuts and bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Attach the 3 wire harness clamps.

  3. INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)

    Click here