ГИДРАВЛИЧЕСКИЙ КЛАПАН ИЗМЕНЕНИЯ ФАЗ СНЯТИЕ

Информация добавлена 08-08-2017

PROCEDURE


  1. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  2. REMOVE NO. 1 AIR CLEANER HOSE

    Click here

  3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

    B001T03

    1. Disconnect the oil control valve connector.

    2. Remove the bolt and oil control valve.

    3. Remove the O-ring from the oil control valve.

  4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

    B001PDK

    1. Disconnect the oil control valve connector.

    2. Remove the bolt and oil control valve.

    3. Remove the O-ring from the oil control valve.

  5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

    B001TB4

    1. Disconnect the oil control valve connector.

    2. Remove the bolt and oil control valve.

    3. Remove the O-ring from the oil control valve.

  6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

    B001QFJ

    1. Disconnect the oil control valve connector.

    2. Remove the bolt and oil control valve.

    3. Remove the O-ring from the oil control valve.