РЫЧАГ ПЕРЕКЛЮЧЕНИЯ ПЕРЕДАЧ УСТАНОВКА

Информация добавлена 08-08-2017

PROCEDURE


  1. INSTALL NO. 1 CONSOLE BOX MOUNTING BRACKET


    1. Install the No. 1 console box mounting bracket with the 2 screws.

  2. INSTALL SHIFT LEVER ASSEMBLY


    1. Install the transmission floor shift assembly with the 4 bolts and tighten the bolts in the order shown in the illustration.

      A01A2YIN01
      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }
    2. Connect the 2 connectors and attach the wire harness clamp.

  3. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


    1. Turn the socket of the transmission control cable assembly 180° counterclockwise. While holding the socket in place, push in the lock piece until the lock piece clicks twice.

      Note

      Do not over-rotate the socket as it will come off the internal spring and the transmission control cable assembly will not be reusable.

      A01A5NZC05
      *1 Socket *2 Lock Piece
      *a Push in - -

      Tech Tips

      If the lock piece cannot be pushed in, slightly turn the socket clockwise and then push in the lock piece again.

    2. Install the outer part of the transmission control cable assembly to the shift lever retainer. Check that the socket and lock piece are in their original positions.

      A01A2NSC08
      *1 Shift Lever Retainer - -
    3. B001U04C08
      *1 Slider
      *2 Lock Piece

      Slide the slider in the direction shown in the illustration and pull out the lock piece.

    4. B001V85

      Connect the transmission control cable end of the cable to the transmission floor shift assembly.

      Note


      • Make sure that the lock piece is pulled out.

      • Push the end of the cable all the way to the base of the pin.

    5. B001U58

      Push the lock piece into the adjuster case and lock it.

      Note

      Make sure that the lock piece is completely locked by the slider.

  4. INSPECT SHIFT LEVER POSITION

    Click here

  5. INSTALL FRONT CONSOLE BOX (w/ Refrigerated Cool Box)

    Click here