Информация добавлена 08-08-2017
PROCEDURE
INSTALL OIL COOLER ASSEMBLY
Install a new seal washer to the bolt.
Install the oil cooler with the bolt and nut.
| for bolt | ||
| 68 N*m | 693 kgf*cm | 50 ft.*lbf |
| for nut | ||
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
| *a | Upward |
| *b | Rearward |
Install the 2 hoses.
The direction of the hose clamp is indicated in the illustration.
INSTALL OIL FILTER BRACKET
CONNECT WATER BY-PASS PIPE SUB-ASSEMBLY
| *a | Upward |
| *b | Rearward |
Connect the 2 hoses and water by-pass pipe.
The direction of the hose clamp is indicated in the illustration.
Install the 3 bolts.
| 10 N*m | 102 kgf*cm | 7 ft.*lbf |
INSTALL OIL FILTER ELEMENT
ADD ENGINE OIL
CHECK ENGINE OIL LEVEL
ADD ENGINE COOLANT
INSPECT FOR ENGINE OIL LEAK
INSPECT FOR COOLANT LEAK
INSTALL UPPER RADIATOR SUPPORT SEAL
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
INSTALL LOWER FRONT BUMPER COVER