КЛАПАН ПРИНУДИТЕЛЬНОЙ ВЕНТИЛЯЦИИ КАРТЕРА УСТАНОВКА

PROCEDURE


  1. INSTALL PCV VALVE SUB-ASSEMBLY


    1. Apply adhesive to 2 or 3 threads of the PCV valve.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    2. Install the PCV valve.

      Torque:
      27 N*m  { 275 kgf*cm, 20 ft.*lbf }
    3. Connect the PCV hose to the PCV valve.

    4. Secure the hose with the clamp.

  2. CONNECT HEATER HOSE


    1. Connect the heater hose clamp.

  3. INSTALL ENGINE ROOM SIDE COVER LH

    Click here

  4. INSTALL V-BANK COVER SUB-ASSEMBLY

    Click here