POWER WINDOW MASTER SWITCH INSTALLATION


  1. INSTALL MULTIPLEX NETWORK MASTER SWITCH ASSEMBLY


    1. Install the multiplex network master switch assembly with the 3 screws.

  2. INSTALL POWER WINDOW REGULATOR MASTER SWITCH ASSEMBLY WITH FRONT DOOR ARMREST BASE PANEL


    1. Connect the connector.

    2. A003VBU

      Engage the 2 guides, 3 clips and 7 claws, and install the power window regulator master switch assembly with front door armrest base panel.