METER / GAUGE SYSTEM, Diagnostic DTC:B1500

DTC Code DTC Name
B1500 Fuel Sender Open Detected

DESCRIPTION

This DTC is stored when the combination meter assembly detects a fuel sender gauge malfunction via a direct line.

DTC No. DTC Detection Condition Trouble Area
B1500

When IG voltage is 9.5 V or more and the following condition is detected:


  1. Fuel sender gauge operation malfunction


  • Harness or connector

  • Fuel sender gauge assembly

  • Combination meter assembly

WIRING DIAGRAM

A003XOCE33

INSPECTION PROCEDURE

PROCEDURE


  1. READ VALUE USING INTELLIGENT TESTER (FUEL INPUT)


    1. Connect the intelligent tester to the DLC3.

    2. Turn the power switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Body / Combination Meter / Data List.

    5. Check the values by referring to the table below.

      Combination Meter
      Tester Display Measurement Item/Range Normal Condition Diagnostic Note
      Fuel Input Fuel input signal/Min.: 0, Max.: 127.5 Fuel indicates F: 39.6 Unit: Liter
      Fuel indicates 3/4: 31.0
      Fuel indicates 1/2: 22.8
      Fuel indicates 1/4: 14.3
      Fuel indicates E: 5.1
      Result
      Result Proceed to
      Fuel level data can be displayed on the intelligent tester and DTC B1500 is output. A
      Fuel level data cannot be displayed on the intelligent tester. B

    B
    A
  2. INSPECT FUEL SENDER GAUGE ASSEMBLY


    1. A003YSIE88
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Combination Meter Assembly)

      Disconnect the H19 connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      H19-27 (L) - H19-30 (FE) Always 13.5 to 414.5 Ω

    NG
    OK
  3. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - FUEL SENDER GAUGE ASSEMBLY)


    1. Disconnect the P9 connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      H19-27 (L) - P9-2 (FS) Always Below 1 Ω
      H19-27 (L) - Body ground Always 10 kΩ or higher
      H19-30 (FE) - P9-3 (FE) Always Below 1 Ω
      H19-30 (FE) - Body ground Always 10 kΩ or higher

    NG
    OK
  4. INSPECT FUEL SENDER GAUGE ASSEMBLY


    1. A003VY5E01
      Text in Illustration
      *a

      Front view of wire harness connector

      (to Fuel Sender Gauge Assembly)

      Remove the fuel sender gauge assembly Click here for 2ZR-FXE, Click here for 5ZR-FXE).

    2. Check that the float moves smoothly between E and F.

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      1 - 2 Float level is F (upper) 13.5 to 16.5 Ω
      1 - 2 Float level is between F (upper) and E (lower) 13.5 to 414.5 Ω (Gradually changes)
      1 - 2 Float level is E (lower) 405.5 to 414.5 Ω
      Result
      Result Proceed to
      OK A
      NG (for 2ZR-FXE) B
      NG (for 5ZR-FXE) C

    B
    C
    A