DESCRIPTION
The main body ECU (multiplex network ECU) controls the footwell lights.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
PERFORM ACTIVE TEST USING INTELLIGENT TESTER
Connect the intelligent tester to the DLC3.
Turn the power switch on (IG).
Turn the intelligent tester on.
Enter the following menus: Body / Main Body / Active Test.
Check that the footwell lights come on.
| Tester Display | Test Part | Control Range | Diagnostic Note |
|---|---|---|---|
| Fr Foot Light | Footwell lights | ON/OFF | Power switch off |
| OK |
|---|
| Footwell lights come on. |
| NG |
|
CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - AUXILIARY BATTERY) Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - AUXILIARY BATTERY)
Disconnect the 2B instrument panel junction block assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
Remove the instrument panel junction block assembly Click here.
Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Measure the resistance according to the value(s) in the table below.
| *a | Component without harness connected (Instrument Panel Junction Block Assembly) |
*b | Component without harness connected (Instrument Panel Junction Block Assembly) |
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY Click here |
| OK |
|
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Click here