INTEGRATION RELAY REMOVAL


  1. PRECAUTION

    Note

    After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work Click here.

  2. REMOVE REAR NO. 2 FLOOR BOARD


    1. Remove the rear No. 2 floor board.

  3. REMOVE REAR DECK FLOOR BOX


    1. Remove the rear deck floor box.

  4. REMOVE REAR NO. 3 FLOOR BOARD


    1. Remove the rear No. 3 floor board.

  5. REMOVE DECK FLOOR BOX RH


    1. A003Z5J

      Remove the clip.

    2. Disengage the 6 guides and remove the deck floor box RH.

  6. REMOVE REAR FLOOR BOARD UPPER NO. 3 PLATE


    1. A003VKN

      Disengage the 4 claws and 2 guides, and remove the rear floor board upper No. 3 plate.

  7. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

    CAUTION:

    Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  8. REMOVE NO. 1 RELAY BLOCK COVER


    1. A003Z98

      Disengage the 3 claws and remove the No. 1 relay block cover as shown in the illustration.

  9. REMOVE NO. 1 INTEGRATION RELAY


    1. A003Y27

      Disengage the 2 claws and pull up the No. 1 integration relay as shown in the illustration.

    2. A003WOU

      Disconnect the 3 connectors and remove the No. 1 integration relay.