SKID CONTROL BUZZER (for LHD) INSTALLATION


  1. INSTALL SKID CONTROL BUZZER ASSEMBLY


    1. Connect the skid control buzzer connector.

    2. Install the skid control buzzer assembly.

  2. INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY


    1. Check that the power switch is off.

    2. Check that the cable is disconnected from the negative (-) auxiliary battery terminal.

      CAUTION:

      Wait at least 90 seconds after disconnecting the cable from the negative (-) auxiliary battery terminal to disable the SRS system.

    3. A003XQ7

      Connect the airbag connector to the lower No. 1 instrument panel airbag assembly.

      Note

      When connecting any airbag connector, take care not to damage the airbag wire harness.

    4. Push in the lock to install the airbag connector.

    5. Temporarily install the lower No. 1 instrument panel airbag assembly with the 6 claws and 3 guides.

    6. Install the 4 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note

      Confirm that the lower No. 1 instrument panel airbag assembly is installed securely without any excessive gaps and is not protruding outward.

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY


    1. Connect each connector.

    2. Engage the clamp.

    3. Engage the clip.

    4. Install the No. 1 instrument panel under cover sub-assembly with the 2 screws <E>.

  4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL


  5. PERFORM DIAGNOSTIC SYSTEM CHECK

    Click here

  6. INSPECT SRS WARNING LIGHT

    Click here