INSTALL ECM
Install the 2 ECM brackets to the ECM with the 4 screws.
Install the ECM with the 2 bolts.
Connect the 2 ECM connectors.
Connect the 2 ECM connectors and lower the 2 levers.
Note
When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
Make sure that the 2 levers are securely locked.
Install the wire harness clamp.
INSTALL INVERTER RESERVE TANK ASSEMBLY
Install the inverter reserve tank assembly with the 2 bolts.
INSTALL INVERTER WITH CONVERTER ASSEMBLY
CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Connect the negative auxiliary battery cable with the nut.
Note
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.
INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE
Engage the 4 claws and 2 guides to install the rear floor board upper No. 3 plate.
INSTALL DECK FLOOR BOX RH
Engage the 6 guides.
Install the deck floor box RH with the clip.
INSTALL REAR NO. 3 FLOOR BOARD
Install the rear No. 3 floor board.
INSTALL REAR DECK FLOOR BOX
Install the rear deck floor box.
INSTALL REAR NO. 2 FLOOR BOARD
Install the rear No. 2 floor board.
PERFORM INITIALIZATION
Note
Perform Initialization when replacing the ECM Click here.
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.