BATTERY SMART UNIT INSTALLATION


  1. INSTALL BATTERY SMART UNIT

    CAUTION:

    Be sure to wear insulated gloves and protective goggles.


    1. Install the battery smart unit with the 2 bolts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the 3 connectors.

      Note

      The connectors should be connected securely.

  2. INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY

    Click here