ECM INSTALLATION


  1. INSTALL ECM


    1. Install the ECM with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    2. Install the 2 wire harness clamps.

    3. Connect the 2 ECM connectors.


      1. A003TON

        Connect the 2 ECM connectors and lower the 2 levers.

        Note


        • When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

        • Make sure that the 2 levers are securely locked.

      2. Install the 2 wire harness clamps.

    4. Install the No. 2 engine room wire with the bolt.

      Torque:
      8.3 N*m  { 85 kgf*cm, 73 in.*lbf }
    5. A003SQ0

      Slide the side cover down and engage the 2 claws to install it.

    6. A003TC7

      Slide the engine room wire harness down and engage the 2 claws to install it.

    7. Connect the 3 wire harness connectors.

    8. Install the No. 1 relay block cover.

  2. INSTALL INVERTER RESERVE TANK ASSEMBLY


    1. Install the inverter reserve tank assembly with the 2 bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL BATTERY BOX COVER


    1. Engage the 3 guides to install the battery box cover.

  5. INSTALL REAR DECK FLOOR BOX


    1. Install the rear deck floor box.

  6. INSTALL REAR FLOOR MAT


    1. Install the rear floor mat.

  7. PERFORM INITIALIZATION

    Tech Tips

    Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.


    1. Perform Initialization when replacing the ECM Click here.