DESCRIPTION
When the power switch is turned on (IG), battery voltage is applied to IGSW of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil, closing the contacts of the No. 2 integration relay (EFI MAIN relay) and supplying power to either terminal +B and +B2 of the ECM.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND) |
| OK |
|
INSPECT ECM (IGSW VOLTAGE)
| *a | Front view of wire harness connector (to ECM) |
Disconnect the ECM connector.
Turn the power switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
| NG |
|
INSPECT NO. 2 INTEGRATION RELAY (IG2 RELAY) Click here |
| OK |
|
INSPECT NO. 2 INTEGRATION RELAY (EFI MAIN RELAY)
| *a | Component without harness connected (No. 2 Integration Relay) |
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPLACE NO. 2 INTEGRATION RELAY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY (EFI MAIN RELAY) - ECM)
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY (EFI MAIN RELAY) - ECM) |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY (EFI MAIN RELAY) - BODY GROUND)
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY (EFI MAIN RELAY) - BODY GROUND) |
| OK |
|
CHECK NO. 2 INTEGRATION RELAY (POWER SOURCE VOLTAGE)
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
Remove the No. 2 integration relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY - BATTERY) |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
INSPECT NO. 2 INTEGRATION RELAY (IG2 RELAY)
| *a | Component without harness connected (No. 2 Integration Relay) |
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||
|---|---|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPLACE NO. 2 INTEGRATION RELAY Click here |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY (IG2 RELAY) - ECM)
Disconnect the ECM connector.
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the ECM connector.
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY (IG2 RELAY) - ECM) |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY (IG2 RELAY) - BATTERY)
| *a | Front view of wire harness connector (to No. 2 Integration Relay) |
Remove the No. 2 integration relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY - BATTERY) |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY (IG2 RELAY) - BODY GROUND)
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY (IG2 RELAY) - BODY GROUND) |
| OK |
|
CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 INTEGRATION RELAY)
Remove the No. 2 integration relay from the engine room relay block.
Disconnect the No. 2 integration relay connector.
Disconnect the power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance (Check for Open) | ||||||
|---|---|---|---|---|---|---|
|
| Standard Resistance (Check for Short) | ||||||
|---|---|---|---|---|---|---|
|
Reconnect the No. 2 integration relay connector.
Reinstall the No. 2 integration relay.
Reconnect the power management control ECU connector.
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 2 INTEGRATION RELAY) |
| OK |
|
CHECK ENTRY AND START SYSTEM Click here