PURGE VALVE INSTALLATION


  1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY


    1. Install the vacuum switching valve assembly with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    2. Connect the 2 fuel vapor feed hoses and connector to the vacuum switching valve assembly.

    3. Connect the No. 1 vacuum switching valve connector.

  2. INSTALL AIR CLEANER CASE


    1. Install the air cleaner case with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Install the hose to the 3 hose clamps.

    3. Install the air cleaner filter element.

  3. INSTALL INLET AIR CLEANER ASSEMBLY


    1. Install the inlet air cleaner assembly with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Connect the wire harness clamp to the inlet air cleaner assembly.

    3. Install the hose to the hose clamp.

  4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. Install the air cleaner cap sub-assembly with the 2 clamps.

    2. Tighten the hose clamp.

    3. Connect the mass air flow meter connector.

  5. INSTALL NO. 2 CYLINDER HEAD COVER


    1. Engage the 3 clips to install the cover.

      Note


      • Be sure to engage the clips securely.

      • Do not apply excessive force or hit the cover to engage the clips. This may cause the cover to break.