DESCRIPTION
The power management control ECU controls the back-up lights.
WIRING DIAGRAM
INSPECTION PROCEDURE
Note
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BATTERY AND BODY GROUND)
Disconnect the 1H and 1G No. 1 integration relay connectors.
Measure the voltage and resistance according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU)
Disconnect the 1G No. 1 integration relay connector.
Disconnect the A98 power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - REAR COMBINATION LIGHT ASSEMBLY)
Disconnect the 1G No. 1 integration relay connector.
Disconnect the M18 and L36 rear combination light assembly connectors.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE NO.1 INTEGRATION RELAY
Replace the No. 1 integration relay with a new or known good one Click here.
Check that the back-up lights operate normally.
| OK |
|---|
| The back-up lights operate normally. |
| NG |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here |
| OK |
|
END