INTEGRATION RELAY INSTALLATION


  1. INSTALL NO. 1 INTEGRATION RELAY


    1. Connect the 3 connectors.

    2. A003TGE

      Engage the 2 claws to install the integration relay as shown in the illustration.

  2. INSTALL NO. 1 RELAY BLOCK COVER


    1. Engage the 2 guides.

    2. Disengage the claw to install the No. 1 relay block cover.

  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL BATTERY BOX COVER


    1. Engage the 3 guides to install the battery box cover.

  5. INSTALL REAR DECK FLOOR BOX


    1. Install the rear deck floor box.

  6. INSTALL REAR FLOOR MAT


    1. Install the rear floor mat.