LIGHTING SYSTEM Indicator Circuit

DESCRIPTION

The headlight beam level control system indicator light in the combination meter assembly comes on for approximately 3 seconds when the power switch is turned to on (IG). The indicator light also comes on when the headlight leveling ECU assembly detects a malfunction.

WIRING DIAGRAM

A01J9OTE03

INSPECTION PROCEDURE

PROCEDURE


  1. CHECK HARNESS AND CONNECTOR (BATTERY - COMBINATION METER ASSEMBLY)


    1. A01JD7WE50
      Text in Illustration
      *1

      Front view of wire harness connector

      (to Combination Meter Assembly)

      Disconnect the L27 combination meter assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      L27-19 (IG+) - Body ground Power switch on (IG) 11 to 14 V
      Power switch off Below 1 V

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - HEADLIGHT LEVELING ECU ASSEMBLY)


    1. Disconnect the A48 headlight leveling ECU assembly connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      A48-6 (WNG) - L27-6 (LVWG) Always Below 1 Ω
      A48-6 (WNG) - Body ground Always 10 kΩ or higher

    NG
    OK
  3. INSPECT NO. 3 METER CIRCUIT PLATE


    1. A01JD9TE01
      Text in Illustration
      *1

      Component with harness connected

      (Combination Meter Assembly)

      Reconnect the L27 combination meter assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Switch Condition Specified Condition
      L27-6 (LVWG) - Body ground Power switch on (IG) 11 to 14 V

    NG
    OK