LIGHTING SYSTEM Footwell Light Circuit

DESCRIPTION

The main body ECU (multiplex network ECU) control the footwell lights.

WIRING DIAGRAM

A01J9CME02

INSPECTION PROCEDURE

PROCEDURE


  1. PERFORM ACTIVE TEST USING INTELLIGENT TESTER


    1. Connect the intelligent tester to the DLC3.

    2. Turn the power switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Body / Main Body / Active Test.

    5. Check that the foot lights come on.

      Main Body
      Tester Display Test Part Control Range Diagnostic Note
      Step Light Operation Footwell lights ON/OFF -
      OK
      Footwell lights come on.

    NG
    OK
  2. CHECK HARNESS AND CONNECTOR (MAIN BODY ECU - BATTERY)


    1. A01JCU1E03
      Text in Illustration
      *1

      Front view of wire harness connector

      (to Instrument Panel Junction Block Assembly)

      Disconnect the 2B instrument panel junction block assembly connector.

    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage
      Tester Connection Condition Specified Condition
      2B-17 - Body ground Always 11 to 14 V
      2B-18 - Body ground Always 11 to 14 V

    NG
    OK
  3. INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY


    1. A01J8VTE03
      Text in Illustration
      *1

      Component without harness connected

      (Instrument Panel Junction Block Assembly)

      Remove the instrument panel junction block assembly.

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance
      Tester Connection Condition Specified Condition
      2B-17 - A-26 (FSPT) Always Below 1 Ω
      2B-18 - A-26 (FSPT) Always Below 1 Ω
      A-26 - Body ground Always 10 kΩ or higher

    NG
    OK