CANISTER INSPECTION


  1. INSPECT CHARCOAL CANISTER


    1. A01JBYEE02

      Close port C, apply compressed air to port A and check that air flows out from port B.

      If the result is not as specified, replace the charcoal canister.

    2. A01J8E5E02

      Close port C, apply compressed air to port B and check that air flows out from port A.

      If the result is not as specified, replace the charcoal canister.

    3. A01J8GCE02

      Apply compressed air to port B and check that air flows out from port A and port C.

      If the result is not as specified, replace the charcoal canister.

    4. A01J90QE02

      Close ports A and C, and apply compressed air to port B to check for leaks.

      If the result is not as specified, replace the charcoal canister.