DESCRIPTION
The radio and display receiver assembly receives a reverse signal from the power management control ECU via the No. 1 integration relay.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
CHECK HARNESS AND CONNECTOR (REVERSE SIGNAL)
Disconnect the radio and display receiver assembly connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
CHECK HARNESS AND CONNECTOR (RADIO AND DISPLAY RECEIVER ASSEMBLY - NO. 1 INTEGRATION RELAY) Click here |
| OK |
|
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Click here
CHECK HARNESS AND CONNECTOR (RADIO AND DISPLAY RECEIVER ASSEMBLY - NO. 1 INTEGRATION RELAY)
Disconnect the radio and display receiver assembly connector.
Disconnect the No. 1 integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - POWER MANAGEMENT CONTROL ECU)
Disconnect the No. 1 integration relay connector.
Disconnect the power management control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
| OK |
|
REPLACE NO. 1 INTEGRATION RELAY
Replace the No. 1 integration relay with a new or known good one Click here.
Check that the malfunction disappears.
| OK |
|---|
| Malfunction disappears. |
| NG |
|
REPLACE POWER MANAGEMENT CONTROL ECU Click here |
| OK |
|
END (NO. 1 INTEGRATION RELAY WAS DEFECTIVE)