TRANSMISSION CONTROL CABLE INSTALLATION


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. A010ISP

      Install the control cable assembly through the floor hole.

    2. Attach the 2 claws to connect the shift control cable and select control cable to the floor shift lever assembly.

    3. A010M59

      Attach the grommet of the control cable assembly with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    4. A010IDQ

      Connect the end of the shift control cable to the shift lever assembly and install the clip.

    5. A010KH9

      Attach the bracket of the control cable assembly with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    6. A010G0E

      Connect the 2 cables to the control cable bracket with 2 new clips.

    7. A010HU3

      Connect the 2 cables to the transaxle and install the 2 clips.

    8. Release the lock of the cable length adjustment structure of the select cable.


      1. A010H13E01

        Twist the stopper.

      2. A010LA5E01

        Pull the lock piece outward from the case to release the lock.

    9. A010JMCE01
      Text in Illustration
      *1 Select Outer Lever
      *2 Hole

      Align the hole of the select outer lever with the hole in the transaxle case.

    10. A010K2C

      Insert a bolt into the aligned holes to fix the select outer lever in place.

      Note

      Do not push in the bolt forcefully or damage the transaxle case.

      Tech Tips


      • Use a bolt with a diameter of 6 mm (0.236 in.) and a length of at least 16 mm (0.630 in.).

      • Depending on the bolt diameter, it may be difficult to insert the bolt. In that case, use a bolt with a diameter smaller than 6 mm (0.236 in.).

    11. A010LY1

      Connect the end of the select control cable to the shift lever assembly and install the clip.

      Note


      • Make sure the lock piece of the select control cable is facing upward when the select control cable is connected.

      • Make sure the clip is inserted in the direction shown in the illustration.

    12. A010L50E01
      Text in Illustration
      *1 Slider
      *2 Inhibitor Wall

      Push the slider against the inhibitor wall.

      Note


      • Do not pull up the slider.

      • When adjusting the cable, make sure that the shift lever is not in 1 or 2.

    13. Lock the cable length adjustment structure of the select cable.


      1. A010H1FE01

        Push the lock piece into the case with the slider held against the inhibitor wall.

      2. A010LAVE01

        Return the stopper to prevent the lock from being released.

        Note


        • Push in the lock piece completely.

        • Make sure that the cable length adjustment structure is locked securely.

    14. A010JN7

      Remove the bolt to free the select outer lever.

  2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    A010JPR

    1. Install the front No. 1 floor heat insulator with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  3. INSTALL CONSOLE BOX ASSEMBLY

    Click here

  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. A00OI1G

      Install the air cleaner case with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Attach the wire harness clamp to the air cleaner case.

  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. A00OKSA

      Connect the air cleaner cap with the band.

    2. Connect the ventilation hose.

    3. A00OMGP

      Connect the 2 clamps.

    4. A00OKGM

      Attach the wire harness to the 2 clamps.

    5. Connect the mass air flow meter connector.

  6. INSTALL NO. 2 CYLINDER HEAD COVER


    1. A00OIJQ

      Attach the 4 clips to install the cover.

      Note


      • Be sure to attach the clips securely.

      • Do not apply excessive force or hit the cover to attach the clips. This may cause the cover to break.

  7. INSTALL FRONT EXHAUST PIPE ASSEMBLY

    Click here