TRANSMISSION CONTROL CABLE INSTALLATION


  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    1. A005TO5

      Install the control cable assembly through the floor hole.

    2. Attach the 2 claws to connect the shift control cable and select control cable to the floor shift lever assembly.

    3. A005U1C

      Attach the grommet of the control cable assembly with the 2 nuts.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    4. A005TG8

      Connect the end of the shift control cable to the shift lever assembly and install the clip.

    5. A005VJ0

      Attach the bracket of the control cable assembly with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    6. A005W3M

      Connect the 2 cables to the control cable bracket with 2 new clips.

    7. A005VCX

      Connect the 2 cables to the transaxle and install the 2 clips.

    8. Release the lock of the cable length adjustment structure of the select cable.


      1. A005U3EE01

        Twist the stopper.

      2. A005UV4E01

        Pull the lock piece outward from the case to release the lock.

    9. A005TEGE01
      Text in Illustration
      *1 Select Outer Lever
      *2 Hole

      Align the hole of the select outer lever with the hole in the transaxle case.

    10. A005S9P

      Insert a bolt into the aligned holes to fix the select outer lever in place.

      Note

      Do not push in the bolt forcefully or damage the transaxle case.

      Tech Tips


      • Use a bolt with a diameter of 6 mm (0.236 in.) and a length of at least 16 mm (0.630 in.).

      • Depending on the bolt diameter, it may be difficult to insert the bolt. In that case, use a bolt with a diameter smaller than 6 mm (0.236 in.).

    11. A005UUC

      Connect the end of the select control cable to the shift lever assembly and install the clip.

      Note


      • Make sure the lock piece of the select control cable is facing upward when the select control cable is connected.

      • Make sure the clip is inserted in the direction shown in the illustration.

    12. A005VIGE01
      Text in Illustration
      *1 Slider
      *2 Inhibitor Wall

      Push the slider against the inhibitor wall.

      Note


      • Do not pull up the slider.

      • When adjusting the cable, make sure that the shift lever is not in 1 or 2.

    13. Lock the cable length adjustment structure of the select cable.


      1. A005U24E01

        Push the lock piece into the case with the slider held against the inhibitor wall.

      2. A005VX3E01

        Return the stopper to prevent the lock from being released.

        Note


        • Push in the lock piece completely.

        • Make sure that the cable length adjustment structure is locked securely.

    14. A005RE8

      Remove the bolt to free the select outer lever.

  2. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR

    A005RC8

    1. Install the front No. 1 floor heat insulator with the 3 nuts.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
  3. INSTALL CONSOLE BOX ASSEMBLY (w/o Console Box Lid)


    1. Install the console box with the 2 screws.

    2. w/ Power Outlet Socket:


      1. Connect the connectors.

    3. Install the 4 bolts.

      A003DYOE01
  4. INSTALL CONSOLE BOX ASSEMBLY (w/ Console Box Lid)


    1. for Manual Transaxle:


      1. Install the console box with the 2 screws.

    2. for Automatic Transaxle and CVT:


      1. Install the console box with the 4 screws.

    3. w/ Power Outlet Socket:


      1. Connect the connectors.

    4. Install the 4 bolts.

      A00DU43E01
  5. INSTALL CONSOLE BOX CARPET (w/o Console Box Lid)


    1. Install the 3 carpets.

  6. INSTALL CONSOLE BOX CARPET (w/ Console Box Lid)


    1. Install the 2 carpets.

  7. INSTALL REAR CONSOLE BOX CUP HOLDER (w/ Console Box Lid)


    1. Install the cup holder.

  8. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY


    1. A00DQ58

      Attach the 2 claws and 6 clips to install the console panel.

    2. A00DS53

      Attach the cover to the shaft.

  9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    1. A00DR1Q

      Install the shift lever knob and twist it in the direction indicated by the arrow.

  10. INSTALL INSTRUMENT PANEL FINISH PANEL END RH (for RHD)


    1. w/o TOYOTA Parking Assist-sensor System:


      1. Attach the 4 clips and 5 claws to install the panel end.

    2. w/ TOYOTA Parking Assist-sensor System:


      1. Connect the connector.

      2. Attach the 4 clips and 5 claws to install the panel end.

        A00OI5CE01
  11. INSTALL INSTRUMENT PANEL FINISH PANEL END RH (for LHD)


    1. A00OM2F

      Attach the 4 clips and 5 claws to install the panel end.

  12. INSTALL INSTRUMENT PANEL FINISH PANEL END LH


    1. Attach the 4 clips and 5 claws to install the panel end.

      A00OME5E01
  13. INSTALL NO. 3 BOX PANEL (w/ Console Box Lid)


    1. When replacing the No. 3 box panel with a new one:


      1. A00DRPJE01
        Text in Illustration
        *1 Cut

        Cut off the rib (the piece used to maintain the shape of the panel) shown in the illustration.

    2. Attach the 6 clips to install the box panel.

      A00DQBOE01
  14. INSTALL NO. 3 BOX PANEL (w/o Console Box Lid)


    1. When replacing the No. 3 box panel with a new one:


      1. A003DNZE01
        Text in Illustration
        *1 Cut

        Cut off the rib (the piece used to maintain the shape of the panel) shown in the illustration.

    2. A003AMQ

      Attach the 6 clips to install the box panel.

  15. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL


    1. A00OJ4PE01
      Text in Illustration
      *1 Guide
      *2 Clamp

      Attach the guide near the front of the vehicle.

    2. Attach the clamp.

    3. Attach the 2 clips and 5 claws to install the finish panel.

  16. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL


    1. A00OMUOE01
      Text in Illustration
      *1 Guide
      *2 Clamp

      Attach the guide near the front of the vehicle.

    2. Attach the clamp.

    3. Attach the 2 clips and 5 claws to install the finish panel.

  17. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    1. A00OI1G

      Install the air cleaner case with the 3 bolts.

      Torque:
      7.0 N*m  { 71 kgf*cm, 62 in.*lbf }
    2. Attach the wire harness clamp to the air cleaner case.

  18. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    1. A00OKSA

      Connect the air cleaner cap with the band.

    2. Connect the ventilation hose.

    3. A00OMGP

      Connect the 2 clamps.

    4. A00OKGM

      Attach the wire harness to the 2 clamps.

    5. Connect the mass air flow meter connector.

  19. INSTALL NO. 2 CYLINDER HEAD COVER


    1. A00OIJQ

      Attach the 4 clips to install the cover.

      Note


      • Be sure to attach the clips securely.

      • Do not apply excessive force or hit the cover to attach the clips. This may cause the cover to break.

  20. INSTALL FRONT EXHAUST PIPE ASSEMBLY


    1. Install the front exhaust pipe assembly Click here.