INSTALL FLOOR SHIFT ASSEMBLY
Install the floor shift with the 4 bolts.
Note
Tighten the bolts in the order shown in the illustration.
Connect the clamp and 2 connectors.
Move the shift lever to L.
Connect the transmission control cable.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
PERFORM INITIALIZATION
Note
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
ADJUST SHIFT LEVER POSITION
INSPECT SHIFT LEVER POSITION
INSTALL CONSOLE BOX ASSEMBLY