НАПОЛЬНЫЙ РЫЧАГ ПЕРЕКЛЮЧЕНИЯ ПЕРЕДАЧ УСТАНОВКА


  1. INSTALL FLOOR SHIFT ASSEMBLY

    A01J69PE03

    1. Install the floor shift with the 4 bolts.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf }

      Note

      Tighten the bolts in the order shown in the illustration.

    2. A01J72SE02

      Connect the clamp and 2 connectors.

    3. Move the shift lever to L.

    4. Connect the transmission control cable.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  3. PERFORM INITIALIZATION

    Click here

    Note

    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

  4. ADJUST SHIFT LEVER POSITION

    Click here

  5. INSPECT SHIFT LEVER POSITION

    Click here

  6. INSTALL CONSOLE BOX ASSEMBLY

    Click here