ДАТЧИК МАССОВОГО РАСХОДА ВОЗДУХА УСТАНОВКА


  1. INSTALL MASS AIR FLOW METER


    1. A01J5NZ

      Install a new O-ring to the MAF meter.

    2. Install the MAF meter with the 2 screws.

    3. Connect the MAF meter connector.

  2. INSTALL V-BANK COVER

    Torque:
    7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.