INTEGRATION RELAY INSTALLATION


  1. INSTALL NO. 1 INTEGRATION RELAY


    1. Connect the 3 connectors.

    2. A00445O

      Engage the 2 claws to install the No. 1 integration relay as shown in the illustration.

  2. INSTALL NO. 1 RELAY BLOCK COVER


    1. Engage the 3 claws to install the No. 1 relay block cover.

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL REAR NO. 3 FLOOR BOARD UPPER PLATE


    1. Engage the 2 claws to install the rear No. 3 floor board upper plate.

  5. INSTALL DECK FLOOR BOX RH


    1. Install the deck floor box RH Click here.

    2. Install the rear No. 2 floor board.

  6. INSTALL REAR NO. 3 FLOOR BOARD


    1. Install the rear No. 3 floor board.