ECM INSTALLATION


  1. INSTALL ECM


    1. A004379

      Install the ECM with the 2 bolts.

      Torque:
      13 N*m  { 133 kgf*cm, 10 ft.*lbf }
    2. A004241

      Install the 2 wire harness clamps.

    3. Connect the 2 ECM connectors.


      1. A004289

        Connect the 2 ECM connectors and lower the 2 levers.

        Note


        • When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.

        • Make sure that the 2 levers are securely locked.

      2. Install the 2 wire harness clamps.

    4. A00425K

      Install the No. 2 engine room wire with the bolt.

      Torque:
      8.3 N*m  { 85 kgf*cm, 73 in.*lbf }
    5. A0041YY

      Slide the side cover down and engage the 2 claws to install it.

    6. A0042NO

      Slide the engine room wire harness down and engage the 2 claws to install it.

    7. A0043DR

      Connect the 3 wire harness connectors.

    8. Install the No. 1 relay block cover.

  2. INSTALL INVERTER RESERVE TANK ASSEMBLY


    1. A0040GU

      Install the inverter reserve tank assembly with the 2 bolts.

      Torque:
      18 N*m  { 184 kgf*cm, 13 ft.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.

  4. INSTALL DECK FLOOR BOX RH


    1. Engage the claw and 4 guide to install the deck floor box RH.

  5. INSTALL REAR NO. 3 FLOOR BOARD


    1. Install the rear No. 3 floor board.