SHIFT LEVER INSTALLATION


  1. INSTALL SHIFT LOCK CONTROL UNIT ASSEMBLY


    1. Install the shift lock control unit assembly with the 3 nuts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    2. Connect the connector to the shift lock control unit assembly.

  2. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY


    1. A0040B6

      Engage the 7 claws and 2 clips to install the lower center instrument cluster finish panel sub-assembly.

  3. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY


    1. A004159

      Connect each connector.

    2. Engage the 6 claws to install the integration control and panel assembly.

  4. INSTALL SHIFT LEVER KNOB


    1. Using a die (M6 x P1.00 mm), clean the threads of the shift control unit assembly.

    2. A0043RP

      Turn the shift lever knob in the direction of the arrow in the illustration to install it.

    3. A0042QVE01
      Text in Illustration
      *1 Measuring Point

      Using a vernier caliper, adjust the height of the shift lever knob.

      Standard height
      4.1 to 7.1 mm (0.161 to 0.280 in.)
    4. Remove the protective tape around the shift lock control unit assembly.

  5. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

  6. INSTALL DECK FLOOR BOX RH


    1. Engage the claw and 4 guide to install the deck floor box RH.

  7. INSTALL REAR NO. 3 FLOOR BOARD


    1. Install the rear No. 3 floor board.

  8. INSPECT SHIFT LEVER


    1. Turn the power switch on (READY).

    2. Check that all available shift positions can be selected moving the shift lever.

      Tech Tips

      After the shift lock control unit assembly is replaced with a new one, perform the above operation. If this operation is not performed, moving the shift lever may not initially select shift positions.