INSTALL COOLER (SOLAR SENSOR) THERMISTOR (for Automatic Air Conditioning System)
Connect the connector.
Attach the 2 claws to install the cooler thermistor (solar sensor).
INSTALL LIGHT CONTROL SWITCH HOLE COVER (w/ Automatic Light Control System)
Attach the guide and 2 claws to install the light control switch hole cover.
INSTALL AUTOMATIC LIGHT CONTROL SENSOR (w/ Automatic Light Control System)
Attach the 2 claws to install the automatic light control sensor.
INSTALL NO. 2 INSTRUMENT PANEL CUSHION
Clean the instrument panel surface.
Align a new No. 2 instrument panel cushion with the markings on the upper instrument panel and install the No. 2 instrument panel cushion to the position shown in the illustration using double-sided tape.
INSTALL NO. 3 INSTRUMENT PANEL CUSHION
Clean the instrument panel surface.
Align a new No. 3 instrument panel cushion with the markings on the upper instrument panel and install the No. 3 instrument panel cushion to the position shown in the illustration using double-sided tape.
INSTALL NO. 4 INSTRUMENT PANEL CUSHION
Clean the instrument panel surface.
Align a new No. 4 instrument panel cushion with the markings on the upper instrument panel and install the No. 4 instrument panel cushion to the position shown in the illustration using double-sided tape.
INSTALL INSTRUMENT PANEL CUP HOLDER SUB-ASSEMBLY
Tech Tips
Use the same procedure for both instrument panel cup holders.
Install the instrument panel cup holder with the 3 screws <B>.
INSTALL NO. 2 INSTRUMENT PANEL REGISTER ASSEMBLY
Attach the 4 claws to install the No. 2 instrument panel register.
INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY
Tech Tips
Use the same procedure described for the No. 2 instrument panel register.
INSTALL METER MOUNTING BRACKET
Install the meter mounting bracket with the screw <B>.