DESCRIPTION
Shifting from 1st to 5th is performed in combination with the ON and OFF operation of the shift solenoid valves SL1, SL2, S1, S2 and SR, which is controlled by the ECM. If an open or short circuit occurs in the shift solenoid valves, the ECM controls the remaining normal shift solenoid valve to allow the vehicle to be operated safely Click here.
| DTC No. | DTC Detection Condition | Trouble Area |
|---|---|---|
| P0748 | ECM checks for an open or short in shift solenoid valve SL1 circuit while driving and shifting between 4th and 5th gear (1 trip detection logic) Output signal duty equal to 100% Tech Tips SL1 output signal duty is less than 100% under normal condition |
|
MONITOR DESCRIPTION
This DTC indicates an open or short in the shift solenoid valve SL1 circuit. The ECM commands gear shifts by turning the shift solenoid valves ON/OFF. When there is an open or short circuit in any shift solenoid valve circuit, the ECM detects the problem, illuminates the MIL and stores the DTC. Also, the ECM performs the fail-safe function and turns the other normal shift solenoid valves ON/OFF. In case of an open or short circuit, the ECM stops sending current to the circuit.
While driving and shifting between 4th and 5th gears, if the ECM detects an open or short in the shift solenoid valve SL1 circuit, the ECM determines that there is a malfunction Click here.
WIRING DIAGRAM
INSPECTION PROCEDURE
Tech Tips
The shift solenoid valve SL1 turns ON/OFF normally when the shift lever is on D:
| ECM gear shift command | 1st | 2nd | 3rd | 4th | 5th |
| Shift solenoid valve SL1 | OFF | OFF | OFF | OFF | ON |
PROCEDURE
INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SL1)
Disconnect the E1 wire connector.
Measure the resistance of the wire connector.
| Standard resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
INSPECT SHIFT SOLENOID VALVE SL1 Click here |
| OK |
|
CHECK WIRE HARNESS (TRANSMISSION WIRE - ECM)
Disconnect the E16 ECM connector.
Measure the resistance of the wire harness side connector.
| Standard resistance | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS AND CONNECTOR |
| OK |
|
REPLACE ECM
INSPECT SHIFT SOLENOID VALVE SL1
Remove the shift solenoid valve SL1.
Measure the resistance of the solenoid valve.
| Standard resistance |
|---|
| 5.0 to 5.6 Ωat 20°C (68°F) |
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
Check the operating noise of terminal 1 of the solenoid valve.
| OK |
|---|
| Solenoid makes operating noise. |
Tech Tips
Reference: Inspect using an oscilloscope.
Check the waveform of the ECM connector.
| OK | ||||||||
|---|---|---|---|---|---|---|---|---|
| Refer to illustration. | ||||||||
|
| NG |
|
REPLACE SHIFT SOLENOID VALVE SL1 |
| OK |
|
REPAIR OR REPLACE TRANSMISSION WIRE