GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY


    1. A01J5WDE03

      Install the generator with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    2. Install the generator wire with the bolt and nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Attach the terminal cap.

    4. Connect the connector.

  2. INSTALL DRIVE BELT


    1. A01J3KGE04

      Install the drive belt to the pulleys except the drive belt tensioner pulley.

    2. Use the hexagon-shaped part indicated by the arrow in the illustration to move the tensioner pulley downward and then install the drive belt to the tensioner pulley.

      Note


      • The backside of the drive belt should face the tensioner pulley.

      • Check that the drive belt is properly set to each pulley.

    3. A01J5HFE01

      After a new belt has been installed, check that the tensioner indicator mark is within range A shown in the illustration.

  3. INSTALL INTAKE AIR CONNECTOR AND AIR CLEANER ASSEMBLY


    1. A01J33PE01

      Install the air cleaner and intake air connector assembly with the 4 bolts, and tighten the hose clamp.

      Torque:
      14 N*m  { 143 kgf*cm, 10 ft.*lbf, for air cleaner }
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf, for intake air connector }
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf, for hose clamp }
    2. Connect the MAF meter connector and harness clamps.

    3. Connect the No. 2 ventilation hose.

    4. Connect the vacuum hose.

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.