GENERATOR INSTALLATION


  1. INSTALL GENERATOR ASSEMBLY

    A01J5AE

    1. Install the generator and adjusting bar with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    2. Install the generator wire with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    3. Install the terminal cap.

    4. Connect the generator connector.

  2. INSTALL DRIVE BELT


    1. A01J3ZEE02

      Temporarily install the V-ribbed belt tensioner with the 5 bolts.

    2. Install the V-ribbed belt tensioner by tightening bolt 1 and then bolt 2.

      Torque:
      36 N*m  { 367 kgf*cm, 27 ft.*lbf }
    3. Tighten the other bolts.

      Torque:
      36 N*m  { 367 kgf*cm, 27 ft.*lbf }

      Tech Tips

      Each bolt length is as follows:

      A = 70 mm (2.76 in.)

      B = 33 mm (1.30 in.)

  3. INSTALL V-BANK COVER

    Torque:
    7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  5. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.