INSTALL GENERATOR ASSEMBLY
Install the generator and adjusting bar with the 2 bolts.
Install the generator wire with the nut.
Install the terminal cap.
Connect the generator connector.
INSTALL DRIVE BELT
Temporarily install the V-ribbed belt tensioner with the 5 bolts.
Install the V-ribbed belt tensioner by tightening bolt 1 and then bolt 2.
Tighten the other bolts.
Tech Tips
Each bolt length is as follows:
A = 70 mm (2.76 in.)
B = 33 mm (1.30 in.)
INSTALL V-BANK COVER
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
PERFORM INITIALIZATION
Perform initialization Click here.
Note
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.