PCV VALVE INSTALLATION


  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    1. A01J3M3E01

      Apply adhesive to 2 or 3 threads of the valve.

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
    2. A01J5NC

      Install the valve.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    3. Connect the ventilation hose to the valve.

    4. Secure the hose with the clamp.