VACUUM SWITCHING VALVE INSTALLATION


  1. INSTALL PURGE VSV


    1. A01J597

      Install the purge VSV with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    2. Connect the 2 purge line hoses.

    3. Connect the purge VSV connector.

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  3. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.