VACUUM SWITCHING VALVE INSTALLATION


  1. INSTALL PURGE VSV

    A01J332

    1. Install the purge VSV with the bolt.

      Torque:
      5.0 N*m  { 51 kgf*cm, 44 in.*lbf }
    2. Connect the 2 purge line hoses.

    3. Connect the purge VSV connector.

  2. INSTALL V-BANK COVER


    1. Install the cover with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  4. PERFORM INITIALIZATION


    1. Perform initialization Click here.

      Note

      Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.