AIR CONDITIONING PANEL INSTALLATION

PROCEDURE


  1. INSTALL ENGINE SWITCH (w/ Power Switch)

    Click here

  2. INSTALL AMPLIFIER MICROPHONE ASSEMBLY (w/ Microphone)

    Click here

  3. INSTALL ROOM TEMPERATURE SENSOR (COOLER THERMISTOR)

    Click here

  4. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (for LHD)


    1. Connect the connectors and engage the clamp.

    2. Install the cooler hose.

    3. Engage the claw and 7 clips and install the air conditioning control.

  5. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (for RHD)


    1. Connect the connectors and engage the clamp.

    2. Install the cooler hose.

    3. Engage the claw and 7 clips and install the air conditioning control.

  6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL

    Click here

  7. INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY (w/ Radio Receiver)

    Click here

  8. INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY (w/o Radio Receiver)

    Click here

  9. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY

    Click here