COOLER EXPANSION VALVE INSTALLATION

PROCEDURE


  1. INSTALL COOLER EXPANSION VALVE


    1. Apply sufficient compressor oil to 2 new O-rings and the fitting surfaces of the cooler expansion valve.

      Compressor oil
      ND-OIL11 or equivalent
    2. Install the 2 O-rings onto the cooler evaporator.

    3. Using a 4 mm hexagon wrench, install the cooler expansion valve with the 2 hexagon bolts.

      Torque:
      3.5 N*m  { 36 kgf*cm, 31 in.*lbf }
  2. CONNECT LIQUID TUBE SUB-ASSEMBLY A

    Click here

  3. CONNECT SUCTION TUBE SUB-ASSEMBLY B

    Click here

  4. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT

    Click here

  5. WARM UP COMPRESSOR

    Click here

  6. INSPECT FOR REFRIGERANT LEAK

    Click here