COMBINATION METER INSTALLATION

PROCEDURE


  1. INSTALL COMBINATION METER ASSEMBLY


    1. Connect the 2 connectors.

    2. Engage the 2 guides and 2 clips to install the combination meter assembly

    3. Install the 2 screws.

  2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL

    Click here

  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected ( Click here).

  4. INSTALL FRONT FLOOR COVER RH (for Front Floor Cover Type A)

    Click here

  5. INSTALL FRONT FLOOR COVER RH (for Front Floor Cover Type B)

    Click here

  6. INSTALL CENTER FRONT FLOOR COVER (for Front Floor Cover Type B)

    Click here