POWER MANAGEMENT CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. Engage the 3 claws and install the ECU unit bracket.

    2. Install the power management control ECU with the 2 nuts.

      Torque:
      8.3 N*m  { 85 kgf*cm, 73 in.*lbf }
    3. Connect the connectors.

  2. INSTALL MAIN BODY ECU (for LHD)

    Click here

  3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (for RHD)

    Tech Tips

    Use the same procedure as for the LHD side Click here.