PROCEDURE
INSTALL VENTILATION VALVE SUB-ASSEMBLY
Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
| Adhesive |
|---|
| Toyota genuine adhesive 1324, Three Bond 1324 or equivalent |
Using a ball joint lock nut wrench (19 mm), install the ventilation valve sub-assembly.
Note
Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench Click here.
Install the No. 1 ventilation hose.
Install the wire harness with the 2 bolts.
INSTALL NO. 2 CYLINDER HEAD COVER (w/ No. 2 Cylinder Head Cover)