BATTERY BLOWER INSTALLATION

PROCEDURE


  1. INSTALL BATTERY COOLING BLOWER ASSEMBLY


    1. Install the battery cooling blower assembly with the nut and 2 bolts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }

      Note


      • Be sure not to touch the fan part of the battery cooling blower assembly.

      • Do not lift the battery cooling blower assembly using the wire harness.

    2. Connect the clamp and connector.

  2. INSTALL BENCH TYPE REAR SEAT CUSHION ASSEMBLY

    Click here

  3. INSTALL FRONT FLOOR COVER LH (for Front Floor Cover Type A)

    Click here

  4. INSTALL FRONT FLOOR COVER LH (for Front Floor Cover Type B)

    Click here

  5. INSTALL CENTER FRONT FLOOR COVER (for Front Floor Cover Type B)

    Click here

  6. CLEAR DTC

    Click here

    Tech Tips

    If go to service warning light in the combination meter illuminates, clean or replace the battery cooling blower assembly, and clear the DTCs to reset the learning values even if no DTCs are output.